Production Schedule

The Production Schedule add-on is a visual plan for the work that turns orders into finished goods. It is built for the way a small shop actually runs: invoices are the demand, jobs on a calendar are the supply, and the schedule itself shows you when the next unit will be ready. There are no work orders, routings or shift tables to maintain.

What You Get

  • A timeline calendar by production line — day, week and month views with one row per line, bay, bench, team or subcontractor. Drag jobs between lines and days, resize them to change duration.
  • A backlog that fills itself — invoices that contain pre-build kit items appear automatically, waiting to be dragged onto the calendar. Any other invoice can be added from its Options menu.
  • Ad-hoc jobs and blocked time — jobs that are not tied to an invoice (a batch at a welder, a rework, a prototype day) and blocks for cleaning, maintenance, downtime or holidays.
  • Production Complete that flows into inventory — completing an invoice job offers to build its kit items on the spot, which is the one place finished-goods stock is updated.
  • A production forecast — every job can say what it produces, planned batches show which invoices they cover, projected batches fill in the horizon, and an outlook strip tells you when the next uncommitted unit will exist.
  • A REST API — everything on the page, plus the forecast, is available to your own tools. See The Xagle Production Schedule API.

Enabling the Add-on

Go to Settings → Add-ons and enable Production Schedule. It is a Pro-plan add-on billed monthly. A new Production Schedule entry appears in the menu, and four permissions (view, create, update, delete) are added to Settings → User Permissions so you can decide who plans and who only looks.

Production Lines

Lines are the rows of the calendar. Create them from Manage Production Lines on the schedule page: a name, a colour, a display order, and an active flag. A line can be a physical bay or bench, a crew, or an outside shop that does part of the work for you. Jobs are coloured by their line, so a glance at the calendar shows who is busy.

The Backlog

The panel above the calendar lists everything waiting to be scheduled. Invoices land there on their own when they contain an item whose kit type is Requires Pre-Building, and when they match the window and status rules in the gear-button settings:

  • Backlog window — invoices dated within this many days appear (0 means today only, maximum 90).
  • Allow scheduling of — only invoices with pre-build kit items, or all invoices.
  • Statuses — draft only; draft and sent; or draft, sent and paid.

Drag a backlog badge onto a line in the Day or Week view to schedule it. Right-click a badge for Schedule…, View Invoice and Don't Schedule. Don't Schedule keeps an invoice out of the backlog for good (for example a stock sale that needs no production); adding it to the schedule again reverses that. Any invoice can be sent to the backlog or straight onto the calendar from its own Options → Add to Production Schedule, and a scheduled invoice shows a badge that deep-links to its day on the calendar.

Jobs and Blocked Time

Add Job creates a job that is not tied to an invoice: a title, an optional note, a line, a start time and a duration. Leave the line and start blank to park it in the backlog. The Produces fields (item and quantity) are optional but matter: they tell the forecast that this job turns out, say, three TF2500 units. A job with no item is a reminder on the calendar; a job with an item is supply.

Block Out Time reserves a line for something that is not production: cleaning, maintenance, downtime, a holiday, or a stock build. Blocks are coloured by their block type and cannot be sent to the backlog; delete them instead.

Click any event for its details and actions; right-click for the same actions as a menu: View Invoice, Edit Job, Production Complete, Reopen, Unschedule (back to the backlog) and Delete.

Production Complete and Building Kits

Marking an invoice job complete stamps the event and, when the invoice has pre-build kit lines, offers Build Now for each one. Build Now opens the normal Build Kit window with the quantity filled in from the invoice line; building consumes components and adds finished units to stock. Nothing moves in inventory until you build, so a completed job you have not built yet is simply a completed job. Reopen clears the completion if it was marked by mistake.

The Production Forecast

The forecast answers the question a customer actually asks: "if I order today, when will I have it?" It is calculated from the schedule and your invoices, nothing else, and it is only as true as those two things.

How it is calculated. For each item, supply is the stock on hand right now plus every open scheduled job that produces the item. An invoice job counts for its own invoice. A job with Produces filled in is a batch anyone can draw on. Demand is the unshipped quantity on every draft and sent invoice line, oldest invoice first, skipping invoices marked Don't Schedule. Supply is handed out in that order, so every batch knows which invoices it covers and every invoice line gets an expected completion date. Beyond the last planned batch, the forecast adds projected batches that repeat the spacing and size of your planned batches. It needs at least two scheduled batches that produce the item to measure that rhythm; with fewer, the item's Avg. Lead Time stands in for the spacing and the last batch (or, with none yet, the item's Reorder Qty) for the size. Without either it says so rather than guessing. Projection stops once open demand is covered and uncommitted units reach the item's Min. Stock Level (at least one spare unit when no level is set), or after twelve batches or one year.

Building to stock. If you build an item ahead of orders, set its Min. Stock Level on the item. The forecast treats that as the target: uncommitted units in stock and on planned jobs count toward it, projected batches continue until it is met, and the outlook shows when that happens. An item with no open orders and a met target simply shows its stock and no projection.

Production Outlook. The strip above the backlog shows one row per item you make (Source Method Make, or a kit that requires pre-building), whether or not anything is ordered, plus any item an open job produces. Items that only appear on invoices, such as freight or purchased parts, are not listed. To keep a made item off the strip, for example a sub-assembly that goes into another product, set Hide from Production Outlook to Yes on the item (under Inventory); jobs can still produce it. Each row shows on hand, committed (units customers are waiting for), planned (units on scheduled jobs), projected, min. stock (the item's Min. Stock Level, with a Below min. stock badge while uncommitted units fall short and the date the target is reached), and the next uncommitted unit with its date. A green Planned badge means a real job will produce it; a grey Projected badge means the date is extrapolated from your batch rhythm. Click the date to jump to that day.

On the calendar. Producing jobs show their item and quantity in the title. Hover a batch to see the invoice numbers it covers and how many units are left uncommitted. Projected batches appear as dashed, striped events on the same line as the last planned batch. They cannot be dragged. Clicking one opens Add Job with the item, quantity, line, start and duration filled in, so a projection becomes a real job in one click.

Habits that keep the forecast honest

  • Every order is an invoice. A draft is enough. An order that only exists as a job title or a note is invisible to the forecast and its units look free to the next customer.
  • Record shipments when units leave. Shipping is what removes a line from the queue. Old unshipped lines sit at the front of it.
  • Fill in Produces on batch jobs. This is the single field that turns a calendar entry into supply and gives the projection something to repeat.
  • Mark batches complete when they are done. A completed batch is no longer future supply; its units are in stock or shipped.
  • Set Min. Stock Level on items you build to stock. That one number turns the forecast from "cover the orders" into "keep the shelf full".
  • Give new items a lead time and reorder quantity. Until two batches have run, those two fields are what the projection repeats.
  • Treat projected dates as likely, not promised. They are a rhythm, not a booking.

Good to Know

  • Jobs have no capacity limits: two jobs can share a line and an hour. The calendar shows you the clash; it does not prevent it.
  • Schedule times are your company's local time.
  • Deleting or cancelling an invoice removes its schedule event.
  • Forecast dates are production-complete times, not ship dates.
  • Items whose kit type is not Requires Pre-Building never enter the backlog on their own; change the item or set Allow scheduling of to all invoices.